Fillin' Up the Holes...Day 2

May 26, 2010
Crawled out of the tent at 7am, made coffee, and set to work.  Four more holes to fill.  These four were a lot easier and went fairly quickly.  I only had to make sure the tubes were level on all sides and the string ran more or less through the middle.

I finished at 11:30 and Tim came by for the next step.  We used his laser level to mark each tube at an equal level (about 10 inches about ground on the lowest) and then he chainsawed off each tube and we were set to go.  The concrete guys were late, and between 12:30 and 2:30 I napped/read in my tent.
More later....